Skip to content

Home · Move-Out Deep Cleaning · City Walk · Move-Out Cleaning

Move-Out Cleaning · City Walk, Dubai

Move-Out Cleaning in City Walk

Tower handovers are judged on the same list plus the balcony, the sliding tracks and the AC return grille — the three things an agent checks in an apartment and the three most often skipped. Photographed on completion for your deposit file.

The standard

Written before we arrive. Signed before we leave.

In City Walk this job is the full property list plus the handover extras, run by a crew sized to the property and a full day for a villa. It covers every cupboard interior and the oven door glass, and every point is published on the written checklist before we arrive. Points that do not apply to your property come off at the inspection and the price comes down with them.

The full scope for this discipline sits on our Move-Out Deep Cleaning page. For everything else we run in this community, see City Walk cleaning services.

Priced after an inspection and fixed in writing. It does not move on the day unless you ask for work outside the agreed list. Anything missed is put right within 72 hours at no charge.

Everything in City Walk

9 disciplines run in City Walk.

One contractor, one supervisor and one written list across all of them. Booking two together is scheduled as a single visit where the property allows it.

About City Walk

What City Walk property actually needs.

City Walk is a tower and low-rise community developed by Meraas, inland, urban district. Inland and away from the coast, the dominant problem is fine dust rather than salt, and it concentrates in tracks, returns and above joinery.

Condition varies more than size does across any community, so the scope is set at the inspection rather than assumed from the address. We test surfaces before treating them and tell you in writing where something will not come back. Run against what a landlord's agent actually opens: inside every cupboard, the oven cavity and both door panes, extractor filters, tracks and drainage, photographed on completion for your deposit file.

Access in a Meraas community follows the developer's own contractor process. We arrange the pass, the permit and the service-lift booking where one is needed, so a crew is not turned away at the gate and you are not charged for the wait.

Sub-communities and addresses in City Walk

  • Building 1 to 25
  • Boulevard district
  • La Ville district

Not listed? We still cover it — tell us the exact building, frond or plot number when you enquire and we confirm the access process before dispatch.

Request an inspection

Tell us the property. We will tell you the price.

No phone quotes. An inspection, a written list, and a price that does not move on the day. Fill this in and it reaches us complete — no back-and-forth to establish the basics.

Please enter your name.
Enter a phone number or an email address.
Please choose a service.
Tell us where the property is.

Both buttons send the same details. WhatsApp is faster; email works everywhere. Or call +971 58 563 0041.

Call NowWhatsApp